STEP 1 PREPARE SITE
EXCAVATE OR REMOVE EXISTING WALL
STEP 2 DIG AND INSTALL NEW FOOTER
USING LAZER TO INSURE LEVEL BASE
COMPACT USING TAPERS
STEP 3 INSTALL BASE COURSE OF BLOCK
STEP 4 CONTINUE BUILDING WALL
ADD GEOTEX TO WALLS HIGHER THAN 3 FEET
OR WALLS SUBJECT TO EXTRA LOAD
STEP 5 INSTALL DRAINAGE PIPE BEHIND WALL
SLIEVED PERFORATED PIPE
STEP 6 ADD SOIL SEPERATION FABRIC AND CLEAN STONE
STEP 7 COMPLETE WALL TO DESIRED HEIGHT AND
CUT BLOCK AS NEEDED
APPLY CAPS
STEP 8 BACKFILL WALL AND REGRADE SOIL
STEP 9 CLEANUP
|